Investor’s Guide
 
Investment Advantage
Investment Procedure
Q&A
 
 
Investment Enviroment
 
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
 
 
 
 
Q&A
Location:Home>>Investor’s Guide>>Q&A
 
Q:Rohitha

Q:Waste clean wood

Q:Power supply

Q:Utility Costs

Q:What are the conditions and planning of power generation in SSEZ currently?
A:

In Cambodia, the electricity is mainly generated by heavy oils. Because the Sihanouk Province is treated as another new economic center in Cambodia in following few years, the two Cambodian thermal power generation projects are allocated in Sihanouk Province, of which the power station (2*50MW) invested by a Malaysian company has been put into operation in 2013. In July 2013, the SSEZ Company transferred the electricity supply which is generated by the diesel-generator belonging to the SSEZ Company to electricity supplied by the Cambodian Electricity du Company (EDC) with a lower electricity price. Moreover, the self-built generator sets (4*1000KW) are set as reserve power supply when power failures happen.


Q:Does the newly formed company need any bank capital or capital verification certificate?
A:The newly formed company should provide bank deposit proof of 25% of registered capital.

«1 2 3 4 »

 
 
 
 
 

Cambodia Sihanoukville Special Economic Zone
ChineseAdd.:Building No.19,Hongdou Group Headquarters,Hongdou Industrial Zone,Wuxi,Jiangsu,P.R.C.
CambodianSEZ Site Add.:212km of National Road No.4,PreyNob Direct,Sihanoukville,Cambodia
Hotline:86-510-66865968

           855-96-3806690

Marketing & Service Department:855-88-5678891

Fax:86-510-66868503

Email:xhnk@ssez.com

苏ICP备12065480号-1